Wednesday
Apr152009
Vacation Knitting!
Wednesday, April 15, 2009 at 7:20PM
I think I'm ready. My suitcase is packed (except for my toothbrush) and I managed to fit everything inside it. As long as I wear my boots on the plane, and carry the 3 pound bag of walnuts I'm bringing as a hostess gift for the people we're staying with. The 3 pound bag of almonds fit in the suitcase, though.
Most importantly, I have my knitting planned out and ready to go.
See?
Most importantly, I have my knitting planned out and ready to go.
See?
I didn't get the Whisper Cardigan finished (no surprise, considering the part where I have to do 3 inches of K1, P1 ribbing over 250 stitches. Blurgh. I'm halfway through that part), so that's coming with me. The second of Ravi's Argyles. The blue yarn will be a pair of Hedera socks. The fuschia Koigu KPM will be some Nutkins for my mom for Mother's Day (shhhh... don't tell!) and the Brulee will be a pair of over-the-knee lacey socks, for Sock Summit's Sock Hop.
Hope that's enough knitting for two weeks ...
Ja, Ne!
in
knitting
knitting 

Reader Comments